Home › Industries and applications › Renewable energy › Site assessment and resource measurement
Research-grade anemometers mounted on a met mast for a resource campaign
Site assessment and resource measurement

The yield assumption is made
years before the first unit of generation

Three-axis wind measurement, multi-level masts and air density for pre-construction resource campaigns, with the calibration record a financing decision can be reviewed against.

32 Hz
WindMaster Pro output rate
0–65 m/s
WindMaster Pro wind-speed range
6
UKAS-accredited calibration parameters
1985
Building ultrasonic wind sensors in the UK

A campaign that under-measures is discovered years too late

A resource campaign produces one number that everything downstream relies on. The energy yield assumption sets the financing, the turbine selection and the warranty position, and it is fixed long before anything is built.

The error in that number is rarely a dramatic failure. It is a mast that was slightly sheltered, a sensor that iced through three weeks of February, or a turbulence figure taken from a class of instrument that cannot resolve it. None of those announce themselves in the data.

By the time the site is generating, the campaign is history and the shortfall is a commercial argument between parties who each have their own view of what was measured.

Renewable sensing map

Every renewable decision starts at a measurement point

A renewable site measures across the whole asset. Wind at the nacelle and on the mast. Turbulence and shear across the rotor. Irradiance across the array, ambient at the substation, and the condition of the machinery below.

Explore 16 measurement points to see what is being measured, where the measurement happens and which sensing technology fits the application.

Get expert advice

Need mast configuration, output formats or calibration certification?Multi-level mounting, protocol documentation, traceable calibration and drawings. Direct from our engineering team.

Request information

Shear, turbulence and air density are three separate measurements

Hub-height wind speed is the headline, but it is not the whole assumption. Shear across the rotor decides how much of the wind the machine actually sees, and it changes with terrain, surface roughness and atmospheric stability through the day.

Turbulence intensity drives the loads the turbine is certified against, and it is the figure most often taken from an instrument chosen for wind speed alone. A cup anemometer averages away the variation that a turbulence figure is supposed to describe.

Air density converts wind speed into power, and it moves with temperature and pressure across a season. Measuring it on site rather than assuming a standard value is what separates a yield figure from an estimate.

The campaign also has to survive. An upland mast is visited rarely and at cost, so an instrument that keeps reporting through icing is worth more than one with a better bench figure.

Turbulence needs the vertical component

Turbulence intensity and flow inclination are three dimensional quantities. A 2-axis anemometer measures the horizontal vector and cannot resolve the vertical component that carries much of the information.

WindMaster provides 3-axis measurement at 20 Hz with options up to 32 Hz, and WindMaster Pro measures 0 to 65 m/s at 32 Hz in a stainless steel head with a PRT. Where the campaign supports a research programme, the Research range provides 50 Hz and 100 Hz output at 14-bit resolution.

The vertical component, measured rather than assumed

Explore wind sensors

Specify for the winter you will not visit

A resource mast is instrumented once and then left. Access is by track, in conditions that set their own schedule, so every service visit is a cost and a risk that was designed in at specification.

Ultrasonic measurement removes the rotating element that ices and seizes, and a heated variant keeps the record continuous through the weeks that matter most to a seasonal average. MetConnect separates the sensors by height and accepts third-party, analogue and Pt100 inputs, which is what a multi-level mast needs.

One campaign, one continuous record

Compare weather stations

A yield assumption gets audited

Lenders, insurers and turbine suppliers all review the campaign data, and they ask the same questions: which instrument, sited where, calibrated when, and by whom.

That is a specification decision rather than a paperwork one. An instrument supplied with traceable calibration, and kept on an interval, turns a measurement into evidence that holds up when the project is refinanced or the warranty is tested.

Labcal is an independent UKAS-accredited laboratory operating to ISO/IEC 17025:2017, and it calibrates equipment from any manufacturer, which matters on a mast carrying instruments from three suppliers.

What a resource campaign carries

Three-axis wind measurement for turbulence and shear, multi-parameter stations for air density, and the accredited calibration behind both.

Wind measurement

Gill WindMaster 3-axis ultrasonic anemometers
Turbulence

WindMaster

3-axis ultrasonic anemometer

Three-axis measurement for turbulence intensity, flow inclination and shear, where the vertical component is part of the answer rather than an assumption.

Output : WindMaster and WindMaster RA provide 20 Hz with options up to 32 Hz
Pro : WindMaster Pro measures 0 to 65 m/s at 32 Hz, 14-bit, stainless head with PRT
Use : Turbulence intensity, flow inclination, shear across the rotor

View WindMaster

Gill Research range 3-axis ultrasonic anemometers
Research grade

Research range

50 Hz and 100 Hz 3-axis anemometers

Where the campaign supports a research programme or a flux measurement alongside the resource record, and the sampling rate has to resolve the structure of the flow.

Rate : R3-50 and HS-50 provide 50 Hz; R3-100 and HS-100 provide 100 Hz
Resolution : 14-bit digital measurement resolution
Head : Standard head on R3, horizontal head on HS

View Research range

Gill WindSonic ultrasonic anemometers
Secondary levels

WindSonic

Lightweight 2-axis ultrasonic anemometer

The practical choice for the secondary measurement levels on a mast, where horizontal speed and direction are what the shear profile needs.

Range : WindSonic 60 measures 0 to 60 m/s; WindSonic 75 to 0 to 75 m/s
Accuracy : Full-range accuracy published for WindSonic 60 and 75
Options : WindSonic M is heated aluminium, operating to -40 degrees C

View WindSonic

Air density and site conditions

Gill MetConnect weather stations
Multi-level

MetConnect

Separable sensors for WMO-compliant siting

A multi-level mast needs its sensors separated by height rather than stacked in one housing, and it usually needs to bring third-party instruments into the same station.

Siting : Separable sensors mounted at the heights the campaign requires
Inputs : Accepts third-party, analogue and Pt100 inputs
Use : Temperature and pressure for air density, alongside the wind profile

View MetConnect

Gill MaxiMet compact weather stations
Compact

MaxiMet

All-in-one weather station, no moving parts

Where the requirement is one unit, one cable and one output string for the supporting meteorological record beside the primary wind measurement.

Full station : GMX551 carries wind, temperature, humidity, pressure, solar and rainfall
Compact : GMX200 is 0.5 kg and measures wind only
Use : Air density inputs, site conditions, secondary record

View MaxiMet

Gill TruMet PW100 optical rain gauge
Precipitation

TruMet PW100

Infrared optical rain gauge

A solid-state alternative to the tipping bucket on a mast that nobody will visit between commissioning and decommissioning.

Range : 0 to 200 mm/hr, accuracy 5 percent, resolution 0.1 mm
Output : One pulse per 0.1 mm, replicating a tipping bucket
Build : No moving mechanism to block or seize

View TruMet PW100

Not sure which product fits this application?Tell us where it will be installed, what it has to survive and the system the data has to reach. Our team will narrow the range down with you.

Get expert advice

Where resource measurement does the work

Onshore wind

Pre-construction campaigns

Multi-level masts on upland and coastal sites, measuring the shear and turbulence the yield model is built on.

Repowering

Existing sites, new machines

Measuring what the site actually delivers before committing to a larger rotor on the same ground.

Solar and hybrid

Resource and co-location

Wind and meteorological measurement alongside irradiance where a hybrid site shares one grid connection.

Offshore and coastal

Met masts and platforms

Exposed installations where salt, icing and access all argue against a mechanical sensor.

Bankable records

Financing and refinancing

Campaigns whose data will be read by lenders and insurers years after the instruments came down.

Research programmes

Flux and boundary layer

Sites where the resource campaign runs alongside atmospheric measurement at 50 Hz or 100 Hz.

UKAS-accredited calibration for six measurement parameters

Labcal is an independent UKAS-accredited calibration laboratory, Lab 0625, operating to ISO/IEC 17025:2017. It provides calibration across gas and air flow, air velocity, liquid flow, pressure, temperature and humidity.

For a resource campaign that includes anemometers, Pitot tubes, thermal probes, pressure instruments, temperature and humidity probes and data loggers, a single accredited laboratory keeps a mixed mast on one traceable schedule.

01 · Gas and air flow

Gas meters · Mass flow controllers · Dispensing systems

02 · Air velocity

Anemometers · Pitot tubes · Thermal probes

03 · Liquid flow

Flow meters and sensors · Process control equipment

04 · Pressure

Gauges · Transducers · Manometers · Transmitters

05 · Temperature

Thermometers · Probes · Thermocouples · Data loggers

06 · Humidity

Hygrometers · Probes · Transmitters

One laboratory. Six UKAS-accredited parameters.Equipment from any manufacturer.

Explore Calibration Services

Getting a season of data off the mast

A resource campaign produces a continuous record that has to arrive intact, month after month, from a location with no mains power and no one on site.

Gill supports environmental monitoring, industrial sensing, embedded electronics and systems integration, so developers, consultants and met mast contractors can bring measurement into loggers, telemetry and the campaign database.

Whether the requirement is SDI-12 into a low-power logger, Modbus into a site system, or a digital output feeding a research acquisition chain, Gill engineers can support integration from specification through commissioning.

Outputs and options

  • SDI-12 & serial : Low-power loggers on remote masts
  • Modbus RTU : Site systems and SCADA
  • Analogue : Existing logger channels
  • Traceable calibration : So the record holds up on review

What the specification looks like in practice

01

The vertical component is measured

Three-axis ultrasonic measurement resolves turbulence intensity and flow inclination rather than averaging them away, which is what a loads assessment actually needs.

02

Rate to match the question

WindMaster provides 20 Hz with options up to 32 Hz, and the Research range provides 50 Hz and 100 Hz at 14-bit resolution.

03

Nothing rotates, so nothing seizes

There is no rotating sensing element to ice, foul, wear or seize, which is the failure mode that lets a campaign record drift quietly rather than fail obviously.

04

Sited the way the standard expects

MetConnect separates the sensors by height and accepts third-party, analogue and Pt100 inputs, so a multi-level mast can be built the way the siting guidance describes.

05

Built for a season alone on a hill

Heated variants keep the record continuous through the icing weeks that carry the most weight in a seasonal average.

06

Evidence when the project is refinanced

Independent UKAS-accredited calibration across six parameters, for equipment from any manufacturer, so a mixed mast sits on one traceable schedule.

Ready to specify?Talk through approvals, mounting, power and integration with our team before the specification is fixed.

Discuss your requirements

Questions about resource measurement

Resource and site assessment

Turbulence intensity and flow inclination are three dimensional quantities. A 2-axis instrument measures the horizontal vector only, so the vertical component that carries much of the turbulence information is not resolved.

WindMaster provides 3-axis measurement at 20 Hz with options up to 32 Hz. WindMaster Pro measures 0 to 65 m/s at 32 Hz.

Gill engineering insightTurbulence is usually the measurement that gets specified last and questioned first. If the loads assessment is going to rely on it, it is worth choosing the instrument for that job rather than deriving it from a wind-speed sensor.

It depends what the data supports. WindMaster provides 20 Hz with options up to 32 Hz, which suits turbulence and shear for a resource campaign. Where the site also supports a research or flux programme, the Research range provides 50 Hz and 100 Hz.

R3-50 and HS-50 operate at 50 Hz, and R3-100 and HS-100 at 100 Hz, all at 14-bit resolution.

From temperature and pressure measured on site rather than assumed. MetConnect and MaxiMet both provide temperature and pressure alongside the wind measurement, and MetConnect allows those sensors to be separated by height.

Heated variants are available across the range, and WindObserver is heated 316 stainless tested to MIL-STD-810F for icing. The relevant point for a campaign is that a stopped cup anemometer reports calm rather than reporting a fault.

Gill engineering insightThe weeks a mast ices are often the windiest of the year. Losing them does not just create a gap, it biases the seasonal average downwards.

Yes. Labcal is an independent UKAS-accredited calibration laboratory, Lab 0625, operating to ISO/IEC 17025:2017, and it calibrates equipment from any manufacturer across gas and air flow, air velocity, liquid flow, pressure, temperature and humidity.

They are usually redeployed. Because the sensing elements do not wear, an instrument that came off a resource mast can be recalibrated and reused on the operating site, on a repowering campaign or on the next project.

Speak to our team

Tell us what you need to measure, where and under what conditions. We’ll help you work out the appropriate approach.

We aim to respond in one working day.